Supply and install powder-coated aluminum, black, Picket guardrails to unit decks. 1 building, 10 units
Kelleher House was challenging on multiple levels. The engineering was difficult as the curb was not considered a structural element of the building. The slab underneath the curb was of limited depth. Therefore an "L" bracket design was the only option available to replace the decaying steel railings. Our partners at L120 and our designers were able to prove to PET that the "L" shaped design presented very limited pull out forces on the fasteners as most of the force applied to the fasteners with this type of plate design is a shear force. The radius made the design and fabrication more complex. Normal extrusions and processes could not be utilized. The installation was from swing stages and presented challenges for the installation team. Drilling through 10" of concrete, dust control and most importantly safety.
Supply and install powder-coated aluminum, concrete gray, Double-Top Picket guardrails to unit decks, and elevated walkways. 1 building, 20 units
Supply and install powder-coated aluminum, Custom brown, Glass guardrails to unit decks. 2 buildings, 21 units
Manufacture and install powder-coated aluminum frosted glass railings. This project had a multi-step and multi-phase process through out the duration for the project. Once the powder-coated aluminum (color: Urban Bronze) frames was manufactured and passed our strictest QC standards, they were installed and frosted glass measurements were taken. A return trip a few days later would install the frosted glass, and the “last 5%” clean up and QC would complete the install process. We worked hand in hand with our partner Tatley Grund so as sections of the projects were ready, we would come out the repeat the railing process above.